Application
- ACT formation Surge Tool is to be assembled with relevant lock / equalizing assembly. The assembly is to be run in the well bore in a normal manner and device located in relevant nipple. The running tool is to be retrieved prior to utilizing formation surge tool
Advantages
- Designed to allow draw-down to be created across the perforations in order to remove debris
- Can be retrieved by conventional wireline operations, after well pressure is stabilized
Tubing Size | Weight lbs | Surge Tool O.D. | Surge Tool O.D. | Length |
---|---|---|---|---|
2.3/8 | 10.40 | 1.750 | 0.885 | 14.25 |
2.7/8 | 14.30 | 2.150 | 1.096 | 15.50 |
3.1/2 | 20.50 | 2.604 | 1.315 | 16.00 |